Enquiry & Consultation
Tell us about your property, electricity usage, goals, and preferred solar setup.
From first conversation to clean energy
A clear overview of how a solar project moves from the first enquiry to installation, commissioning, handover, and eligible subsidy follow-up.
The shared process
The exact sequence and duration can change based on project size, site conditions, customer readiness, and local approvals.
Planning estimates
Commercial and industrial projects can require additional engineering, utility coordination, procurement, and staged installation.
Typical planning ranges for a standard residential rooftop solar project.
Depends on site access and how quickly the required details are shared.
Can take longer if the system scope or financing needs revision.
Timing depends on the local DISCOM and the applicable process.
Allow extra time for equipment availability, weather, and site readiness.
Authority appointments and local metering processes can affect the schedule.
After required portal steps and document verification; final timing is determined by the scheme authority.
Planning ranges for offices, shops, and commercial properties.
Includes review of bills, operating hours, roof or parking area, and electrical infrastructure.
May include structural, electrical, safety, and return-on-investment review.
Depends on capacity, utility requirements, equipment lead times, and internal approvals.
Varies significantly by system size, work access, and whether installation must be staged.
Subject to utility inspection, metering, and required documentation.
Planning ranges for factories and sites with complex electrical requirements.
Reviews load profile, site constraints, shutdown windows, and integration needs.
May include structural studies, protection coordination, and utility or statutory approvals.
Long-lead equipment and site-specific engineering can extend this stage.
Depends on capacity, site conditions, safety rules, and production schedules.
Includes commissioning tests and applicable utility inspection or synchronization steps.
These ranges are indicative planning estimates, not a promise or guaranteed completion date. Actual timing depends on system capacity, site readiness, equipment supply, weather, utility or DISCOM approvals, inspection availability, documentation, and current scheme rules. Subsidy availability and processing apply only where the project and customer meet the relevant scheme requirements.
Explore rooftop solar for homes and eligible subsidy information.
Explore solutionPlan a system around your business energy needs and operating hours.
Explore solutionUnderstand the additional engineering and commissioning stages for larger sites.
Explore solution